Good product, good way

Industrial Air Conditioners

Industrial air conditioners differ from domestic or domestic air conditioners in many ways. Industrial air conditioners belong to the category of process air conditioners, and household or civilian air conditioners belong to the category of comfort air conditioners. The design of industrial air conditioners is based on ensuring process requirements, and the comfort of indoor personnel is secondary.

Definitions and materials

Industrial air-conditioning refers to air-conditioning equipment that provides environmental temperature, humidity, and cleanliness for the reliable operation of industrial product production processes or industrial process equipment. Such as constant temperature and humidity air conditioners used to ensure the normal operation of electrical control indoor equipment, high temperature special air conditioners used in mobile bridge cranes in steelmaking workshops, low temperature unit air conditioners used in meat processing workshops, etc Belongs to industrial air-conditioning.

Classification

Roof installation, eaves installation, exterior wall installation, window installation, floor installation, mobile.

Function and characteristics

The power consumption of industrial air conditioners is generally large, ranging from dozens of kW to thousands of kW. Generally, 3N ~ 380V 50Hz power is used. Industrial air conditioners are generally designed to operate 24 hours a day and throughout the year, with a service life of more than 15 years. Therefore, the main components of industrial air conditioners, such as compressors, condensers, throttling devices, evaporators, fans, motors, electrical components, etc., use products of well-known brands with high performance and reliability.

In terms of manufacturing technology, industrial air conditioners generally use all-steel sheet metal structure plus panel electrostatic spray baking paint. Has high corrosion resistance. Industrial air conditioners must be tested for performance before leaving the factory to ensure that they meet design requirements. When it is shipped to the user, it also has to undergo installation, commissioning, and other processes. After the commissioning is successful, the unit is officially put into operation.

Image

 

 

Product knowledge

No Related Product knowledge!

Good Methods

No Related Good Methods!

Contact message